I have not been posting again but not because I have been working hard on the bikes or anything. I have just been busy with work.
On the 99:
I do have all the parts to start the FI conversion to the green 99. I am just waiting on a small welding job for the ignition sensor.
On the 600DT to SM:
I also have welded the Oil cooler mounts on the 600DT frame that I will be swapping all the parts from the 95 SM to. Need to check to see if the exhaust will swap as well as make peg mounts. Then Powder coat.
On the 900SS:
The Ducati is at Frame Straight Systems to be modified for the S2R Single sided Swingarm. Stuck until the Frame gets back.
On the new Bike Hauler:
The Van has had a Computer mount installed, the Vanrug ordered, the blue and white stripe removed, and a rear seat (Stock 3 person removable) installed along with WetOkole seat covers on all seats. I will be putting in the chock mounts this week and showing how those are mounted to allow the Baxley Chocks to be removed easily. Also got some MotoCinch hold down clamps that hold the pegs and allow the bikes to ride in the Baxley chocks without any tiedown straps.
Thursday, March 19, 2009
Subscribe to:
Posts (Atom)